Merkur OWF

Project scope

DECO executed and controlled the key tasks related to the cutting and lifting of the 4 pile tops, installed by Seaway Heavy Lifting in the sleeves of  the Merkur OSS jacket, located in the German Bight.

  

Pile cutting specifications

• Pile: 2438 O.D. – 2288 I.D.

• Wall thickness: 75 mm

• 45° beveled cut

• Water depth: 30 m LAT

• Height to be cut off: between 3.3 – 3.8m

Gallery