Project scope

Scaldis contracted Deco’s Cutting and Lifting services during the installation of the offshore substation (OSS) at the The Nordsee One wind farm. 

Scaldis had installed 4 pin piles through sleeves of the Offshore Substation (OSS) jacket. 

Deco has cut and lifted the 4 pile tops.

 

Pile cutting specifications

• Pile diameter: 2438mm

• Wall thickness of piles: 60mm

• Water depth: 28,1m

• Height to be cut off: between 3290 mm and 4390 mm