Project scope

Scaldis contracted Deco’s Cutting and Lifting services during the installation of the offshore substation (OSS) at the The Nordsee One wind farm. 

Scaldis had installed 4 pin piles through sleeves of the Offshore Substation (OSS) jacket. Deco has cut and lifted the 4 pile tops.

 

Pile cutting specifications 

• Number of piles: 4

• Outer pile diameter: 2200mm

• Wall thickness of piles: 50mm

• Water depth: 24m

• Height to be cut off: approx. 4,2m