Decommissioning

Perenco Welland Field | Grout Removal

Project scope

DECO carried out the following work for Boskalis Offshore Marine Contracting:


Offshore Grout Dredging at the Welland WHPS. A purpose built grout dredging tool was

designed and constructed by Deco.


Offshore oil platform with helipad; workers in safety gear walk towards it.

Grout dredging specifications



  • 4 piles with 30” diameter
  • 38 meter water depth
  • Dredging to 4 meters below seabed to allow cutting
  • Removal of 6 meters grout and 4 meters of London clay


ISO-9001 and OHSAS-18001 accredited.


DECO prides itself in working closely with its clients to develop a bespoke and innovative solution. DECO's services are designed for seamless integration in offshore project workflows.

DECO is ISO-9001 & OHSAS-18001 accredited and member of Decom.