Decommissioning

FPSO Mooring Piles, North Sea

Soil plug removal and internal cutting for Boskalis Subsea Services, 160 km east of Shetland.

Project scope

As subcontractor to Boskalis Subsea Services on a North Sea decommissioning project, DECO Subsea removed the soil plugs and cut the FPSO mooring piles, some 160 km east of Shetland. The piles were 2.44 m in diameter with a 63.5 mm wall thickness, in 150 to 165 m of water.


Our IDT ø1800 internal dredging tool cleared the soil plugs to cutting depth. The plugs were very stiff sandy clay, stronger than the geotechnical report suggested; our patented clay dredging technology broke it up and lifted it out by airlift. Each pile was then cut in a single pass with our ICT ø2000 abrasive waterjet tool at 3,000 bar, integrated with an 80 t lifting cross, so cutting and recovery took one crane operation. A hole cutting tool was mobilised as a contingency lifting solution.


All tools went through a full overhaul, FAT and SAT before mobilisation, because at 165 m water depth reliability is not optional.

DECO Subsea dredging and cutting tools on deck for the FPSO mooring pile removal
DECO Subsea internal dredging tool being deployed by crane for the FPSO mooring pile removal

ISO 9001 and ISO 45001 certified.


DECO Subsea prides itself in working closely with its clients to develop a bespoke and innovative solution. DECO Subsea's services are designed for seamless integration in offshore project workflows.

DECO Subsea is ISO 9001 and ISO 45001 certified and an active member of Decom North Sea.