Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Merkur OWF
DECO executed and controlled the key tasks related to the cutting and lifting of the 4 pile tops, installed by Seaway Heavy Lifting in the sleeves of the Merkur OSS jacket, located in the German Bight..
Read more
Rampion OWF
Scaldis contracted Deco’s Cutting and Lifting services during the installation of the offshore substation (OSS) at the The Nordsee One wind farm.
Read more
Offshore WindForce
DECO was responsible for the Cleaning, the Dredging & relief Drilling, ROV and the Cutting & Lifting Services at the Wikinger OWF field in the Baltic Sea.
Read more
Nordsee One OWF
Scaldis contracted Deco’s Cutting and Lifting services during the installation of the offshore substation (OSS) at the The Nordsee One wind farm.
Read more
West of Duddon Sands Substation
DECO designed and built a bespoke cutting frame with lifting capabilities for pile top removal. An industry’s first and a unique approach
Read more
Borkum Riffgrund wind farm
DECO designed and built a bespoke outrunner water jet cleaning frame for the removal of marine growth on monopiles.
Read more
Amrunbank West
DECO developed a bespoke cutting and lifting robot for the removal of pile tops.
Read more
Meerwind Substation
The inrunner robot for the West of Duddon Sands project was modified and used to cut and lift the pile tops of a substation jacket on the MeerWind wind farm
Read more
Belwind Haliade
DECO’s provided dive teams for pile cover removal, pile dredging operations and ROV support throughout the entire project.