Decommissioning

Four-Leg Platform, Dutch North Sea

Cutting and dredging for Scaldis Salvage & Marine Contractors from the heavy lift vessel Gulliver.

Project scope

With Scaldis Salvage & Marine Contractors, DECO Subsea completed the cutting and dredging scope for the decommissioning of a four-legged platform in the Dutch sector of the North Sea, working from the heavy lift vessel Gulliver. Our full dredging and cutting spread was mobilised on board and operational within a single day in Vlissingen.


All four jacket piles (1,435 mm inner diameter, 44.5 mm wall thickness) were internally dredged to below cut elevation with our IDT internal dredging tool and cut with our ICT1320 abrasive waterjet cutting tool. The final cut was confirmed barely three and a half days after arrival in the field.


The soil included a hard clay layer with undrained shear strengths of up to 1,200 kPa, beneath cemented, carbonate-rich sands: among the most demanding conditions for soil plug removal. Every cut was verified and signed off on the spot by the Scaldis project team.

Heavy lift vessel Gulliver removing a four-leg platform jacket in the Dutch North Sea
Jacket leg and lifting crane during the four-leg platform removal, seen from the deck of HLV Gulliver

ISO 9001 and ISO 45001 certified.


DECO Subsea prides itself in working closely with its clients to develop a bespoke and innovative solution. DECO Subsea's services are designed for seamless integration in offshore project workflows.

DECO Subsea is ISO 9001 and ISO 45001 certified and an active member of Decom North Sea.

DNV GL ISO 9001 certification logo: blue and green design, text
DNV-GL OHSAS 18001 management system certification logo in blue, white, and green.
Blue and purple gradient